slab bottom mud jacking 板底压浆
Construction of the mud slab will be included in the Piling Contract. The Substructure Contractor should allow for breaking up and removal as and when required.
铺设泥土石板路面将包含在打桩合同中。如有必要,地下建筑承包商负责对其拆除与清理。
youdao
应用推荐
模块上移
模块下移
不移动